Magnolia Grove

Processed

Rafael Rivera · QC

Visit

Subdivision
Magnolia Grove
Daily Crew
Submitted By
Rafael Rivera
Role
QC

Subdivision Summary

Full Bins
24
Hrs to Empty
1.8
Truckloads
3.2
Truck Issues
Material pallets blocking two driveways
Usefulness
3
Status
Processed
17 records
Blk 2 Lot 240Rough Framing1Correct LocationLeft Full
Lot 228Rough Framing1Correct LocationEmptied
Lot 32Rough Framing1Correct LocationEmptied
Lot 48Pre-Framing1Correct LocationEmptied
Lot 106Rough Framing1Correct LocationLeft Half Full
Lot 02Rough Framing1Correct LocationBin Missing
Lot 209Rough Framing2Correct LocationLeft Full
Lot 91ARough Framing2Correct LocationEmptied
Lot 94APre-Framing2Correct LocationLeft Half Full
Lot 171ARough Framing1Correct LocationBin Missing
Blk 2 Lot 92Rough Framing1Correct LocationEmptied
Lot 115Rough Framing1Wrong LocationEmptied
Lot 79Framing1Correct LocationEmptied
Lot 61Pre-Framing1Correct LocationLeft Half Full
Lot 206Pre-Framing1Correct LocationEmptied
Extra:Sofa Pickup — paint cans stacked by the garageOpen
Lot 20Pre-Framing1Wrong LocationBin Missing
Lot 89Framing1TBDBin Missing